Eileen FisherA 3,000 sf retail store at the Redmond Town Center. This award-winning store was damaged by water and had to be completely re-built. The fast track schedule required complete demo to turnover to operations in just eight weeks. All interior finishes had to be removed and replaced.
AreosolesKent, WA
A high end 2000 sf shoe store that required turnover in 6 weeks. Finishes included 25’ vaulted entry ceiling; white porcelain tile floor and freestanding wall cabinets throughout the sales floor.
Kress BuildingSeattle, WA
This project was full demolition of the first floor of the Kress building with heavy seismic braces added to two column bays. The floor system was leveled from 0” -18” using a foam / concrete system. All retail shells were finished with a new storefront system with glass / steel canopies over the sidewalk. The retail shells were left raw for the tenants.
Seattle Premium OutletsTwo small retail stores, Aerosole Shoes and Tumi were constructed with in the new center. Both tenant spaces were constructed from a "vanilla shell" . We finished both spaces with painted walls altered lighting and installed tenants retail display fixtures.
Seattle Restaurant StoreThis project was a 6000 sf addition to an old restaurant building that had been converted into a retail store for restaurant supplies. The project was wood framed using large G.L.B. and open trusses. The exterior was E.I.F.S., with a metal roof system.
BMS WestThis project was a 10,000 sf pole building in Issaquah. It required a re-structure of the building and repair column bases, a new slab with forklift ramps, and install all new overhead doors. Phase II was construction of an industrial paint shop within the shell. This involved coordination of owner’s sub-contractors and equipment suppliers.
Experience BlissThis was a 1,000 sf retail store in Bellevue Square. The challenge of this project was its schedule. There was a complete demo of an existing store to tenant turnover in six weeks. The final set of construction documents was not complete until week three of the six-week schedule. This store was open for the Thanksgiving 99 holiday shopping season.
North Bend Building RenoA two-story 5,000 sf building that has seen several remodels and additions over the years. It was completely gutted and taken back to its original shell. A structural upgrade was needed to bring the building up to code. This consisted of two seismic concrete walls the height of the building. To insure historical integrity we replaced all windows with wood frames, which gave an authentic look. We readied the building for a future tenant by installing complete electrical and HVAC up-grades.
Hillsdale Sash & DoorThis project was phase two of the original 10,000 sf pole building that we performed structural upgrades, poured the concrete slab and forklift ramps as well as installed new overhead doors. Our scope in phase two consisted of the project management of owner subcontractors, scheduling and facilitating with the governing agencies for necessary permitting and inspections. We also performed some light-wood framing for new offices and utility rooms, insulation, GWB, timely frames w/ hollow metal doors and mortise hardware.
Aerosoles ShoesThis 1,336 sf project was located in Bellevue Square Mall. It consisted of demolition, light gauge metal framing, coffered ceilings with acoustical lay in ceilings incorporated, new interior finishes to include wood flooring, slate tile, sheet goods, stained concrete, painted GWB and a new storefront system. This project was completed in six weeks on time and on budget.